The cheapest time to add network cabling, cameras, and access control is before the walls are closed. Once drywall is up, every change means cutting, patching, and painting. Whether you are building new or remodeling a leased space, this checklist helps you coordinate low-voltage systems with your architect, general contractor, and other trades.
Step 1: Involve Your Low-Voltage Contractor Early
Bring in the contractor who will install your cabling and security systems during design, not after framing. Ask them to review the floor plan for outlet locations, equipment room size, and cable pathways. See how to choose a low-voltage contractor.
Step 2: Plan Every Connection Point
- Workstations: at least two data drops per desk position, plus spares in meeting rooms and break areas.
- Wi-Fi access points: ceiling drops placed from a coverage plan. See why Wi-Fi has dead spots.
- Phones, printers, and displays: each needs a connection. See VoIP requirements.
- Cameras: entrances, exits, parking, cash areas, and equipment rooms. See camera placement and IP vs. analog cameras.
- Door access: card readers, door contacts, and request-to-exit devices need cable and power at the door. See access control.
- Future use: spare drops and empty conduit for equipment you may add later.
Step 3: Design the Equipment Room
- Enough floor and wall space for racks, patch panels, and growth.
- Dedicated electrical circuits and a plan for battery backup.
- Cooling, since network equipment generates heat and closets overheat easily.
- A lockable door, and space kept free of storage and janitorial supplies.
- Pathways between the room and the rest of the building, with room for more cable.
Use our network closet checklist as a guide.
Step 4: Coordinate With Other Trades
- Electrical: power at camera, access point, and door locations, and separation between power and data cable.
- Ceilings and framing: cable trays, J-hooks, and conduits need to be planned before ceilings go in.
- Fire and building code: use the correct cable ratings and firestop any wall or floor penetrations. Your installer and local building officials can confirm what applies.
- Internet provider: order service early, since installation can take weeks. See choosing business internet.
- Furniture and signage: make sure floor outlets and wall drops match where furniture will actually go.
Step 5: Insist on Labeling, Testing, and Documentation
Before you accept the work, you should receive: labeled jacks and patch panel ports, test results for every cable, and as-built drawings showing where everything runs. These save time and money for the life of the building. For cost expectations, see network cabling cost in California, and if you are moving into an existing space, see our office move checklist.
Get Your Plans Reviewed Before Construction
Scio Info Tech can review your floor plan and recommend cabling, camera, access control, and Wi-Fi locations for projects across California. Send us your plans early and save money later.